Research Value Calculator
Explore how changes in research time could affect your team’s capacity and the estimated value of that time. Illustrative estimates only—not a prediction of results.
Your Research Scenario
Starting values are examples, not PearlDiver performance benchmarks. Enter total team hours for studies you expect to conduct. Exclude studies counted as avoided below.
Feasibility & Avoided Study Expenses
Estimate the value of identifying studies that should not proceed before committing further resources. Complete all three fields to include this estimate.
Count only decisions informed by these assessments. Exclude expenses already incurred and time value counted above. Include additional assessment costs in proposed costs if applicable.
Annual Cost Comparison — Optional
Enter your costs or a quoted price. Leave both fields blank to exclude this comparison.
These fields are not a PearlDiver price quote. Include relevant additional assessment costs here if you want them reflected in the comparison.
Your Illustrative Results
Annual Research Effort
Total team hours per year
Estimated Annual Value
Positive values extend right; negative values extend left.
Feasibility Value
- Feasibility assessments per year
- —
- Expected studies not proceeding per year
- —
- Potential avoided study expenses
- —
Complete all feasibility inputs to include this estimate.
Financial Results
- Annual research time value
- $96,000
- Potential avoided study expenses
- Not included
- Annual tools/data cost difference
- Not included
- Combined annual value estimate
- $96,000
Includes research time value only.
Planning estimates include time value and potential avoided expenses, not demonstrated cash savings. Do not count the same benefit in multiple categories.
Explore What Fits Your Research Team.
Discuss study feasibility, research needs, available data, and pricing with PearlDiver.
Request a DemoHow the estimates are calculated
This calculator uses your inputs to estimate annual research time value, potential avoided study expenses, and an optional difference in tools/data costs. Starting values are illustrative, not PearlDiver performance benchmarks or pricing.
Annual Research Effort
Current effort = studies per year × current hours per study.
Expected effort = studies per year × expected hours per study.
Enter total team hours, rather than elapsed calendar time.
Annual Hours Released
Studies per year × (current hours per study − expected hours per study).
If expected hours exceed current hours, the result represents additional effort rather than time released.
Annual Research Time Value
Annual hours released × value per research hour.
Example: 8 studies × (120 − 40 hours) × $150 = $96,000. Time released may support other work without reducing payroll or actual spending.
Expected Studies Not Proceeding
Feasibility assessments per year × expected percentage not proceeding ÷ 100.
Example: 10 assessments × 20% = 2 studies. Fractional results represent an expected annual average. Count only decisions informed by these assessments.
Potential Avoided Study Expenses
Expected studies not proceeding × average remaining expense avoided per study.
Example: 2 studies × $50,000 = $100,000. Include only spending that otherwise would have occurred and can still be avoided. Exclude costs already incurred.
Optional Annual Cost Difference
Current annual tools/data cost − proposed annual tools/data cost.
A lower proposed cost adds to estimated value; a higher proposed cost reduces it. Enter costs appropriate to your organization or a quoted price. These fields are not a PearlDiver price quote.
Combined Annual Value Estimate
Annual research time value + potential avoided study expenses + annual cost difference.
Only completed optional sections are included. Blank or incomplete sections are excluded—not assumed to have no actual costs or benefits.
Avoid Double Counting
Enter research time for studies you expect to conduct, excluding studies counted as avoided. Do not include the same labor value in both time value and avoided study expenses.
Include additional feasibility assessment or implementation costs in proposed costs where applicable.
Reading the Charts
The effort chart compares current and expected annual team hours. The value chart uses a shared dollar scale: positive values extend right and negative values extend left.
The combined bar totals the included components; it is not an additional benefit.
Planning Estimates, Not Guaranteed Savings
Results depend on your assumptions and do not establish that PearlDiver will produce those outcomes. Actual value depends on data suitability, study requirements, adoption, and costs.
The calculator does not measure research quality, clinical benefit, or financial return as a percentage.